Soft Story Retrofit Apartment Building Los Angeles Guide

Table of Contents

Two-story Los Angeles apartment building with tuck-under parking, its upper floors resting on thin posts above an open carport

If you own, buy or sell older rental income properties in the city, the Los Angeles soft-story retrofit ordinance for apartment buildings shapes capital budgets, tenant relations and pricing. This guide covers who is in scope, the deadlines, common retrofit methods, cost drivers and how retrofit status affects a sale.

What a Soft Story Retrofit Apartment Building in Los Angeles Requires

Side-by-side diagram: an unretrofitted soft-story building leaning over its open parking level, beside the same building held straight by a steel frame and new footings

A soft-story building has a weak or open ground floor, such as tuck-under parking, large window walls or ground-floor commercial space. That level lacks the lateral strength to resist strong shaking, so the floors above can shift or collapse onto it.

A retrofit adds strength and stiffness at the ground level so the structure holds together.

The scale is large. According to LAist’s report on the city’s soft-story list, Los Angeles identified 13,500 apartment and condominium buildings that need to be retrofitted.

13,500
apartment and condominium buildings identified as needing retrofit
1978
buildings permitted or built before January 1, 1978 are covered
7 years
to complete retrofit or demolition after the Order to Comply

Which Buildings the LA Mandatory Soft-Story Ordinance Covers

The City of Los Angeles runs its soft story retrofit program through LADBS, and it targets wood-frame apartment buildings with an open ground floor.

Ordinance No. 183893 targets wood-frame buildings of two or more stories, permitted or built before January 1, 1978, with four or more units and an open ground floor such as a parking area. YD Group’s explainer on the Los Angeles soft-story retrofit program lists these criteria in full.

Criterion Requirement
Construction type Wood frame
Age Permitted or built before January 1, 1978
Height Two or more stories
Units Four or more dwelling units
Ground floor Open, soft or weak (parking, large openings)
Ordinance coverage criteria

Owners usually learn they are in scope through an Order to Comply from the Los Angeles Department of Building and Safety (LADBS). Buyers should check a property’s status with LADBS before they write an offer.

Is a Tuck-Under Parking Building a Soft Story Apartment Building?

Usually, yes. Parking tucked under units on posts is the classic soft-story layout. Buildings with ground-floor retail or wide storefront glass can qualify too.

If you retrofitted voluntarily before receiving an order, you can submit proof of the prior work. Have an engineer confirm it meets the ordinance’s standards.

Compliance Deadlines After an Order to Comply

Timeline of LA soft-story deadlines after an Order to Comply: plans at 2 years, permit at 3.5 years, finished retrofit at 7 years

The clock starts when the order is served. A summary of the mandatory program’s compliance timeline sets out three milestones.

Milestone Time from Order to Comply
Submit proof of prior retrofit, or retrofit or demolition plans 2 years
Obtain permit to start construction or demolition 3.5 years
Complete retrofit or demolition 7 years
Compliance milestones

Depending on when your order was served, some deadlines may already have passed. That makes retrofit status a due-diligence question for any buyer. Ask LADBS or a land-use attorney about penalties for a missed deadline.

Common Soft Story Retrofit Methods

New steel moment frame and concrete footings installed across the parking opening of a tuck-under apartment building during a soft-story retrofit
Method How it works Typical use
Steel moment frames Beams and columns that resist sideways movement Wide parking openings
Cantilever columns Steel columns fixed into new footings Tight layouts with limited wall space
Plywood shear walls Sheathed walls that brace the ground level Where solid wall lines are possible
Foundation work New footings and anchoring Supports most of the above
Retrofit methods

The structural engineer picks a method based on parking layout, opening sizes and site conditions. Expect parking stalls to be out of use during work, and send tenant notices early.

Soft Story Retrofit Cost and How It Is Budgeted

Costs vary widely by building, which is why owner threads on Reddit report very different numbers. Compare bids line by line, not by total price. Once the work is finished, revisit your earthquake coverage and policy pricing, since a completed retrofit can affect how carriers rate the building.

Soft Story Retrofit Apartment Building Los Angeles Cost Drivers

  • Number and width of ground-floor openings
  • Foundation and footing work
  • Engineering and plan check fees
  • Permit fees
  • Relocating utilities, meters or drainage
  • Tenant relocation, if required

Confirm what each bid includes: engineering, permits, finish work and warranties. For soft story retrofit financing, ask LADBS about the Earthquake Multi-Unit Retrofit (EMR) grant program, which has its own eligibility criteria.

Its eligibility criteria differ from the main ordinance, so check directly with LADBS.

Tenant Pass-Through Rules Under the LA Rent Stabilization Ordinance

Most covered buildings fall under the Rent Stabilization Ordinance (RSO). The RSO allows owners to recover part of approved retrofit costs through a temporary monthly tenant surcharge.

Confirm the current share, monthly cap and amortization period with the Los Angeles Housing Department (LAHD) before you budget. Keep every invoice, permit and payment record for the application.

How a Soft Story Retrofit Affects Value and a Sale

Retrofit status is part of investment property valuation. On an unretrofitted building, buyers price in the work, and lenders or insurers may ask more questions.

A completed and finaled retrofit removes a major capital item from underwriting. On value-add listings like The Park Place Apartments in Harbor City, building condition and rental upside both feed into pricing.

Retrofit Status Checklist for Buyers and Sellers

Item to check Why it matters
LADBS order status Confirms scope and deadlines
Permits finaled Proves work is complete and approved
Engineer plans Shows what was built
Pass-through approvals Affects rent roll and income
Disclosure documents Reduces escrow surprises
Retrofit status checklist

Sellers should gather permit sign-offs before listing. For an example of how we take a Los Angeles apartment property to market, see our $6.4 million sale of a 29-unit apartment property in Sylmar.

Planning a Sale or 1031 Exchange Around a Retrofit

If you plan to sell a soft story apartment building in Los Angeles, decide early whether to retrofit first or sell with the work priced in.

Owners have two paths: retrofit before selling, or sell as-is with a price adjustment. Retrofitting first can widen the buyer pool. Selling as-is saves time if a buyer has the capital and appetite for the work.

In a 1031 exchange, construction timing matters on both sides. If your replacement property still needs its retrofit, make sure open permits or lender conditions won’t push closing past the 180-day deadline. Documented improvements also shape buyer interest, as with 5005 August Street, an 86% renovated 44-unit community.

Stepp Commercial advises Southern California multifamily owners on pricing and sale strategy, including how retrofit status fits into the numbers.

Frequently asked questions

Does the ordinance apply to condos as well as apartments?
Yes. The city’s soft-story list includes both apartments and condominiums that meet the criteria.
How much does a soft story retrofit cost?
It depends on openings, foundation work, engineering, permits and utilities. Get several detailed bids from licensed engineers and contractors.
Can I pass retrofit costs on to RSO tenants?
Part of approved costs can be recovered through a temporary surcharge. Confirm current limits with LAHD.
Can I sell a building that has not completed its retrofit?
Yes, but buyers will price in the remaining work and deadlines. Disclose the order status clearly.
How do I find out if my building is on the soft-story list?
Look up the property address with LADBS or check whether you received an Order to Comply.

Key Takeaway for Los Angeles Apartment Owners

Soft-story compliance is both a legal duty and a value driver. Verify your building’s status early, keep complete records, and plan the retrofit around your hold or sale strategy.